Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

University of Cincinnati

Messer Construction

GBBN Architects

CMTA Engineers

Education, Dormitories

$5.2 million

This 14-story project offered unique challenges due to strict delivery and installation schedules. TP Mechanical was asked to install the HVAC scope within a 12-month time frame.

Our team approach for this project was to think outside the box and ask: “What can be fabricated offsite and delivered just in time for installation and what systems can we not pre-fabricate?”.

This approach allowed us to maximize production with our on-site project team, and fabricate all materials being installed on this project. The coordination between our project management team, fabrication facility and distribution center helped to make us the premier contractor for this challenge.

Fabricated Systems

  • Hydronic Piping System including riser and horizontal branch piping
  • Equipment Packages
  • Steam & Steam Condensate horizontal branch piping
  • Coil Pack Assembly

State