Allegion Steelcraft Boiler Replacement

News

Projects

Service

Allegion Steelcraft Boiler Replacement

A 900,000 square foot manufacturing facility in southern Ohio hired TP Mechanical to replace two, 70-year-old boilers. TP not only completed this project in six weeks, but during the demolition and installation, there was no disruption to the manufacturing facility’s production. TP replaced the dated, inefficient boilers with a new hydronic boiler and steam boiler. The two boilers deliver energy efficient coverage for the entire facility, including a manufacturing area and several offices. One benefit of the new steam boiler is during the winter months, the equipment can easily be converted from burning natural gas to propane. This was a unique project requirement as during heating season, the owner will switch to propane for significant energy and cost savings due to the size of the facility.