Roark Engineering

Preventative maintenance and service was provided for the 100,000 square foot plus facility. We are currently in 2nd year of a 3-year hybrid HVAC agreement to replace aging R-22 HVAC equipment with new R410A units.

Allegion Steelcraft Boiler Replacement

A 900,000 square foot manufacturing facility in southern Ohio hired TP Mechanical to replace two, 70-year-old boilers. TP not only completed this project in six weeks, but during the demolition and installation, there was no disruption to the manufacturing facility’s production. TP replaced the dated, inefficient boilers with a new hydronic boiler and steam boiler. […]

Slot Drains

The TP fabrication team developed an innovative solution to the challenges of installing slot drains. The traditional method of driving rebar into the ground and assembling each piece is time-consuming and challenging to keep straight and secure during the concrete pour. Instead, TP prefabricates the slot drains. The drain can be assembled up to 40 […]

Grease Traps and Interceptors

Due to the danger of having men six to eight feet below ground, this was a perfect project for fabrication. The team preassembled grease interceptors on a skid resulting in a safer environment, better-quality product and enhanced the project schedule.

Fire Protection Services

After a small fire in this Columbus manufacturing facility, our Fire Protection team lead arrived on site promptly to get their fire protection system back online.

Topre

Topre is an automotive stamping plant. Forty-foot racks of process piping were installed. We also did some prefabrication for the mechanical room. Due to the prefabrication, on-site installation of the mechanical room just took over one day.  Installation went very quickly for the overhead piping out in the plant; installed within hours because hangars were […]

Avalign Technologies

Preventative maintenance and service was provided for the 200,000-square foot facility. TP also installed air conditioning for the entire plant and duct work for machinery exhaust.

The OSU NRDT Temporary Energy Plant

A series of residence hall renovations on the campus of The Ohio State University posed a unique challenge – maintaining mechanical and water service after demolition of the residence hall that contains the current energy plant for the area. TP Mechanical developed a creative solution – a temporary energy plant to operate for 18 months […]

TP’s Service Team Invests in Safety Measures for a 20-acre Chemical Manufacturing Customer

Thanks to TP’s investment in company safety and our initiative to take safety training to the next level, our service team was awarded a sizable preventative maintenance contract for a chemical manufacturing client in Addyston, Ohio. Located on the Ohio River, the manufacturer’s 20-acre campus houses over 60 buildings, ranging from administrative spaces to large […]

Boiler Replacement at a Large Manufacturing Facility in Southern Ohio

A 900,000 square foot manufacturing facility in southern Ohio recently hired TP Mechanical to replace two, 70-year-old boilers. TP not only completed this project in six weeks, but during the demolition and installation, there was no disruption to the manufacturing facility’s production. TP replaced dated, inefficient boilers with a new hydronic boiler and steam boiler. […]

TP Implements New Fabrication Method – Fully Prefabricated Mechanical Rooms

In today’s ever-changing construction environment, TP Mechanical continues to adapt and innovate. We know the challenges of large-scale construction projects, and for over thirty years we’ve answered them with our market-leading, quality-driven fabrication division. As a leader in the fabrication industry, TP continues to push the envelope with new technology and capabilities. We are proud […]