Pharmacy Renovation

This project consisted of the renovation of two spaces for new pharmacies – one serving the hospital and the other serving the oncology space. For the oncology space pharmacy, our team was only able to work after 5 p.m. The job site was cleaned and put back in its original form when done for the […]
WPAFB C-Line

Size was no obstacle when installing two boiler and one pump skid for the WPAFB C-line project. Assembling all three skids in our Cincinnati fabrication shop took nearly five months from start to finish while the team on-site placed overhead piping to prepare for the preassembled skids. To transport the skids, the largest of which […]
Bethesda North Hospital – TCC

Bethesda North Hospital in Montgomery, Ohio, has served patients in the greater Cincinnati area for decades. In 2019, the hospital underwent an extensive expansion to increase the space for heart patients and enhance the cancer treatment center. The three-story addition features cutting edge technology and top-of-the-line patient facilities. TP was honored to provide the hydronic […]
Harrison Junior High and Central Elementary

The new VRF system in the junior high will allow each classroom to run either heat or cooling; these systems are convenient for comfort in each individual classroom and are also highly energy efficient. Unique to an elementary school, all the plumbing was designed and installed with elementary students in mind. Drinking fountains, bathroom fixtures […]
Grease Traps and Interceptors

Due to the danger of having men six to eight feet below ground, this was a perfect project for fabrication. The team preassembled grease interceptors on a skid resulting in a safer environment, better-quality product and enhanced the project schedule.
Adena Health Systems – Adena Regional Medical Center

Our team prefabricated about 50 headwalls for this Ohio hospital. These headwalls will be placed behind each bed to provide air, oxygen and vacuum for doctors and nurses to provide critical care efficiently. Prefabricating these headwalls in our facility helps us to remain on or ahead of schedule and minimize waste.
University of Kentucky Dormitory Project

TP Mechanical’s design/build capabilities deliver a unique value to our customers. We pair decades of knowledge and experience with the latest technology. Utilizing an integrated design-build delivery team, this partnership met a challenging schedule on four dormitory projects at the University of Kentucky. The projects included the development of new dormitories plus new residence halls […]
TriHealth Baldwin Headquarters

The 12-story Baldwin 200 building was built in 1990 and is part of The Baldwin Center located near Eden Park in Cincinnati. In the fall of 2017, TP Mechanical started working with Cushman Wakefield, GBBN Architects and James Hunt Construction to design the HVAC systems for the first floor and sixth through twelfth floors on […]
Mount Carmel St. Ann’s Tower
Mt. Carmel New Albany Hospital Surgery & Nursing Addition

The New Albany Surgical Hospital project at 7333 Smith’s Mill Road, New Albany, Ohio, was completed in January 2011. TP Mechanical installed and remodeled the HVAC, plumbing and fire protection systems. The Mt. Carmel New Albany Hospital has a long-standing tradition of excellence. For seven years running, they have received the Summit Award from the national […]
Adena Northeast Expansion

The Adena Northeast Expansion project at 272 Hospital Road, Chillicothe, OH, was completed in April 2010; TP Mechanical installed the plumbing, HVAC and fire protection systems and provided coordination services. The project’s original contract value was $7,010,142, and had a final contract value of $7,168,000, due to owner additions and changes. The project was originally […]
Miami Valley Hospital Heart Tower

The Miami Valley Heart Tower project located at One Wyoming Street, Dayton, OH started in September 2008 was completed in December 2010 with a total construction value of $31.3 million. TP Mechanical was the plumbing and mechanical contractor for the project with a design-assist contract. The 12-story tower addition to the main campus of Miami […]