Customer: Allegion Steelcraft Building: Manufacturing facility
Size: 900,000 square feet on 20 acres of landThe work at the plant began as small projects including the replacement of HVAC equipment and five rooftop units. These projects lead to a preventative maintenance HVAC contract in 2016. In 2017, the contract was expanded to include plumbing and fire suppression to their annual contract.
The ApproachPer the expanded contract, TP Mechanical has proactively provided the following services:
Quarterly maintenance of HVAC systems Boilers Chillers Roof-top units Unit heaters Process refrigeration HVAC repairs Air Balancing Backflow maintenance & repairs Cleaning of all coils and equipment outside of the building The ResultsProactively maintaining Allegion’s equipment has enabled us ...Read More
Owner:
Construction Manager:
Engineer:
Industry:
Contract:
SENKO
Denham Blythe
TP Mechanical
Industrial
$720,000
Project DescriptionDuring the summer of 2016, our service team in Lexington, Kentucky, was tasked with a project that included designing and installing an industrial walk-in cooler and freezer for Senko (U.S.A), Inc.
Measuring 23,000 square feet in size, configuring these refrigeration systems presented several challenges. Chief among those was the need for the units to run at different temperatures consistently throughout the day + 34 degrees in the cooler and -20 degrees in the freezer. We needed to find a cost-effective solution for the owners that still allowed the systems to run at optimal temperatures. We delivered by ...Read More