Roark Engineering

Preventative maintenance and service was provided for the 100,000 square foot plus facility. We are currently in 2nd year of a 3-year hybrid HVAC agreement to replace aging R-22 HVAC equipment with new R410A units.

iHeartRadio

The new iHeartRadio studio space is located in Lexington’s nine-story, multi-use development, CityCenter. For the project, TP installed new HVAC, ductwork and plumbing for five radio studios and a small kitchen area. To navigate noise restrictions and respect “quiet times” for residents and other tenants, TP performed all core drilling between 5pm and 7pm and […]

Crown Recovery

TP Mechanical’s scope included HVAC and plumbing in two of the buildings on the campus. In the first building, our team installed 17 new VAV boxes, added plumbing for washers and dryers, as well as added and reworked the vent systems to better accommodate a new layout and function. In the second building, our team […]

601 W. Main – Louisville Hotel

TP prefabricated and installed two long pieces of grease ductwork, one of which was 30 feet and the second 40 feet long. This ductwork runs vertically from the hotel’s basement kitchen up six stories to the roof exhaust. Prefabrication of this duct saved countless labor hours on-site minimizing installation time.

Adena Health Systems – Adena Regional Medical Center

Prefabricated Hospital Headwalls

Our team prefabricated about 50 headwalls for this Ohio hospital. These headwalls will be placed behind each bed to provide air, oxygen and vacuum for doctors and nurses to provide critical care efficiently. Prefabricating these headwalls in our facility helps us to remain on or ahead of schedule and minimize waste.