Minority Inclusion

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Dunnhumby

Turner Construction Company

Gensler

KLH Engineers

Office

$1.2 million

December 2013

February 2015

dunnhumbyUSA is expanding their Cincinnati, Ohio, office location to a brand new building downtown. dunnhumby is known for their business model of customer science, which means they use company data to analyze their customers’ wants and needs, to help their companies build loyal relationships. The overall design of the building inside and out is made to showcase the company’s collaborative culture; it is set up so the public of downtown Cincinnati can have a view of how the employees work. The building will consist of about 650 to 700 employees.

dunnhumby will ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

EdR

Messer Construction

Sherman-Carter-Barnhart

TP Mechanical

Education / University Dormitory

$6.5 million

July 2013

July 2014

 

This dormitory facility opened in the Fall of 2014, bringing two bedroom suites to the University of Kentucky campus. One of the key components is the integrated first floor classrooms and the Johnson Recreation Center.

TP Mechanical’s design/build capabilities deliver a unique value to our customers. We pair decades of knowledge and experience with the latest technology. Utilizing an integrated design-build delivery team, this partnership met a challenging schedule on four dormitory projects at the University of Kentucky. The projects included development of new dormitories, plus new residence ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

EdR

Messer Construction

Sherman-Carter-Barnhart

TP Mechanical

Education / University Dormitory

$7.1 million

July 2013

July 2014

 

Champions Court I opened in the Fall of 2014. It offers students two person suites with private bedrooms. Students have individual doors to their bedroom and share a bathroom and small common space with their roommate.

Our team at TP Mechanical was able to provide design/build capabilities that deliver a unique value to our customers. We pair decades of knowledge and experience with the latest technology. Utilizing an integrated design-build delivery team, this partnership met a challenging schedule on four dormitory projects at the University of Kentucky. The ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Ross Local Schools

Turner Construction Company

SHP Leading Design

SHP Leading Design

Education

$2.8 million

January 2014

August 2014

Butler County’s 10 public school districts have spent a combined $24.4 million in construction, renovations and capital improvements this summer. (Poturalski, 2014)

For many schools districts the repairs were routine re-paving parking lots, but many were also upgrading classrooms to accommodate STEM classes and updating buildings with more security features and energy-efficient systems. (Poturalski, 2014)

Renovations to Morgan include secure entrances; a new energy efficient geothermal heating and cooling system; an enlarged cafeteria and kitchen; new music and art classrooms; new life/safety systems including sprinklers, fire alarms and security cameras; all doors and ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

The Christ Hospital

Messer Construction

SOM Ohio LLC

Fosdick and Hilmer

Hospital

$4.8 million

May 2013

TBD

The Christ Hospital in Cincinnati, Ohio, began construction of a $265-million expansion in June 2012. The new Orthopedic and Spine Center will enable Christ to be the only local hospital, and one of a few in the country, to have a single-purpose facility with a focus on comprehensive orthopaedic and spine services and research.

Once completed, the new 332,000-square-foot facility, which will be located just south of the main hospital, will physically connect to the current hospital while providing separate access for patients and visitors. The orthopaedic ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

The Ohio State University

Axis Construction

Larsen Engineering Inc

Larsen Engineering Inc

Education

$1.1 million

June 2008

August 2008

Morrison Tower, a twelve story residential home for students of The Ohio State University, opened its doors in September 1962. The OSU Board of Trustees named the building in memory of Mary Franc Morrison, the first women to receive a degree from the University. During a renovation and building update, TP Mechanical was hired for the Lead HVAC contract and fan coil replacement.

The residence hall is located on the south side of campus and houses many first-year students. Some of the building’s amenities include: ...Read More

The Ohio State University has been making some major changes throughout their campus. Everything from dorms and dining facilities to fitness centers and recreational spaces are being constructed. Even a new retail pavilion will be added within this major campus expansion and renovation. The two major projects have been the $171 million South Campus High Rise renovation and the $370 million renovation to the North Campus.

The South Campus High Rise renovation combined four building into two which provided a more social atmosphere for the students, added 360 new beds as well as private bathrooms. The major addition was the chiller ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Mount Carmel Health Systems

Messer Construction Company

Moody Nolan Architects

Heapy Engineering

Hospital

$2.6 million

May 2010

January 2011

The New Albany Surgical Hospital project at 7333 Smith’s Mill Road, New Albany, Ohio, was completed in January 2011.  TP Mechanical installed and remodeled the HVAC, plumbing and fire protection systems.

The Mt. Carmel New Albany Hospital has a long-standing tradition of excellence. For seven years running, they have received the Summit Award from the national healthcare research firm, Press Ganey Associates, for “sustained excellence in patient care.” Building surgery and nursing additions furthered their value proposition as a leader in the healthcare field in ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Methodist Eldercare Services

Messer Construction Company

pH7 Architects, Inc.

X-Cel Engineering

Healthcare

$1.9 million

February 2011

May 2012

The Wesley Glenn Wellness & Therapy addition began in the early spring of 2011, taking more than 14,000 man hours to complete by May of 2012. The Wesley Glen project was a building addition to an existing wellness center in a retirement village associated with Methodist Eldercare. The retirement facility had been using a bus to transport its residents across town to their sister facility for wellness and therapy and decided to add the center to their Clintonville location. 

The building’s design included a well-equipped workout ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Cincinnati City School District

Turner/DAG/TYS

SFA Architects

SFA Architects

Education, High School

$2.6 million

February 2008

March 2013

The Western Hills | Dater High School project, located at 2144 Ferguson Road, Cincinnati, Ohio, started October 2010 and was completed in March 2013 with a total construction value of $51,716,340. TP Mechanical was contracted for the plumbing portion of this renovation. 

During the construction renovation of this project, the school remained open and occupied, which meant the project had to be completed in phases. This was tricky at times because we were replacing the piping while making sure the students and staff still had running ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Premier Health Partners

Skanska Shook, JV

Gresham Smith and Partners

Gresham Smith and Partners

Healthcare

$16.2 million

February 2011

September 2012

The Miami Valley Hospital South Bed Tower project at 5801 Clyo Road, Centerville, OH was completed in September 2012 with a total construction value of $16.2 million. Miami Valley Hospital South (MVHS) added a five-story addition with 64 private patient rooms dedicated to orthopedics, obstetrical and medical surgical care as part of its long-range facility plan. TP Mechanical installed the HVAC piping, sheet metal, medical gas piping and plumbing under a design assist contract.

The aggressive project schedule created challenges for the construction team.  TP ...Read More