888-534-4928

Green Construction

TP Mechanical’s design/build capabilities deliver a unique value to our customers. We pair decades of knowledge and experience with the latest technology.

Utilizing an integrated design-build delivery team, this partnership met a challenging schedule on four dormitory projects at the University of Kentucky. The projects included development of new dormitories, plus new residence halls on the north end of campus (Cooperstown).

TP Mechanical designed each building by utilizing Building Information Modeling (BIM) technology. TP Mechanical’s team then created the detailed installation drawings. The plumbing design for the projects included domestic hot and cold water, natural gas systems and ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

EdR

Messer Construction

Sherman-Carter-Barnhart

TP Mechanical

Education / University Dormitory

$3.1 million

July 2013

July 2014

 

Haggin Hall opened in 2014 and features double shared suites with an open floor plan. This renovation marks the completion of the previous Haggin Field facility.

TP Mechanical’s design/build capabilities deliver a unique value to our customers. We pair decades of knowledge and experience with the latest technology. Utilizing an integrated design-build delivery team, this partnership met a challenging schedule on four dormitory projects at the University of Kentucky. The projects included development of new dormitories, plus new residence halls on the north end of campus (Cooperstown).

TP Mechanical ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

EdR

Messer Construction

Sherman-Carter-Barnhart

TP Mechanical

Education / University Dormitory

$3.8 million

July 2013

July 2014

 

Champions Court II opened in the Fall of 2014. It offers students two and four person suites with private bedrooms. Students have individual doors to their bedroom and share a bathroom and small common space with their roommate.

Our team at TP Mechanical was able to provide design/build capabilities that deliver a unique value to our customers. We pair decades of knowledge and experience with the latest technology. Utilizing an integrated design-build delivery team, this partnership met a challenging schedule on four dormitory projects at the University of ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Ross Local Schools

Turner Construction Company

SHP Leading Design

SHP Leading Design

Education

$2.8 million

January 2014

August 2014

Butler County’s 10 public school districts have spent a combined $24.4 million in construction, renovations and capital improvements this summer. (Poturalski, 2014)

For many schools districts the repairs were routine re-paving parking lots, but many were also upgrading classrooms to accommodate STEM classes and updating buildings with more security features and energy-efficient systems. (Poturalski, 2014)

Renovations to Morgan include secure entrances; a new energy efficient geothermal heating and cooling system; an enlarged cafeteria and kitchen; new music and art classrooms; new life/safety systems including sprinklers, fire alarms and security cameras; all doors and ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

The Christ Hospital

Messer Construction

SOM Ohio LLC

Fosdick and Hilmer

Hospital

$4.8 million

May 2013

TBD

The Christ Hospital in Cincinnati, Ohio, began construction of a $265-million expansion in June 2012. The new Orthopedic and Spine Center will enable Christ to be the only local hospital, and one of a few in the country, to have a single-purpose facility with a focus on comprehensive orthopaedic and spine services and research.

Once completed, the new 332,000-square-foot facility, which will be located just south of the main hospital, will physically connect to the current hospital while providing separate access for patients and visitors. The orthopaedic ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

The Ohio State University

Rockwood Builders

Braun & Steidl Architects, Inc.

Karpinski Engineering

Education

$1.1 million

June 2009

August 2009

Taylor Tower is a 13-story residence hall on the campus of The Ohio State University Campus.  This dormitory serves as the residence hall for students within several programs, including Honors, Business Honors and Allies for Diversity. The building was originally constructed in 1965 and 1966; TP Mechanical was hired as the Lead HVAC Contractor and for Fan Coil Replacement.

Located on the north side of campus, Taylor Tower features a weight room, wireless internet, cable TV, kitchen facilities, study area and a bike room. ...Read More

The Ohio State University has been making some major changes throughout their campus. Everything from dorms and dining facilities to fitness centers and recreational spaces are being constructed. Even a new retail pavilion will be added within this major campus expansion and renovation. The two major projects have been the $171 million South Campus High Rise renovation and the $370 million renovation to the North Campus.

The South Campus High Rise renovation combined four building into two which provided a more social atmosphere for the students, added 360 new beds as well as private bathrooms. The major addition was the chiller ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Premier Health Partners

Skanska Shook, JV

NBBJ

Korda/Nemeth Engineering

Hospital

$31.3 million

September 2008

December 2010

The Miami Valley Heart Tower project located at One Wyoming Street, Dayton, OH started in September 2008 was completed in December 2010 with a total construction value of $31.3 million. TP Mechanical was the plumbing and mechanical contractor for the project with a design-assist contract. The 12-story tower addition to the main campus of Miami Valley Hospital was constructed with 6 floors of cast-in-place concrete topped with structural steel and clad with a combination of precast and curtain-wall. The focus of the new tower is a comprehensive heart ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

The Ohio State University

Smoot Construction

Caldwell Associates

Heapy Engineering

University, Dorms

$30.7 million

June 2011

July 2012

The past three years, TP Mechanical has held multiple mechanical systems contracts for plumbing, HVAC, and fire protection with The Ohio State University for projects known as the South High Rise buildings. We started working in Park-Stradley Hall and then moved to Smith-Steeb & Siebert. We are currently working on new bid contracts for this renovation. TP Mechanical was hired as the lead contractor in MEP coordination and REVIT modeling.

For this massive undertaking at one of the country’s largest universities, TP Mechanical utilized fabrication in our ISO-registered ...Read More

Project Overview

The Fidelity Investments project at 100 Howe Drive, Covington, Kentucky was completed in November 2008 with a total construction value of $6.4 million.

Fidelity Investments needed a new facility to perform and manage their operations.  A corporate, long-term goal was to reduce the engergy consumption inorder to reinvest into the company.  TP Mechancial was selected as the contractor to reach thier goal.  We installed the first engergy efficient, nybride under floor air distribution (UFAD) and chilled beam system in the Central United States.  This system has the potential to reduce Fidelity Investment’s energy costs by twenty-two percent.

Read More

When it came time to renovate Cunz Hall on the campus of The Ohio State University, TP Mechanical was proud to work with Ruscilli Construction on the $24.4 million project. The HVAC and Plumbing portions of the contract on this home to the University’s College of Public Health involved a complete overhaul of the systems, including hydronic service for steam, chilled water, hot water and refrigeration piping. The plumbing installation included cold and hot water, lab water, lab air and storm and sanitary systems. TP Mechanical’s fabrication team supplied exhaust and return air ductwork.

The building, originally constructed in 1968, became ...Read More

Skip to toolbar