July 2012

July 2013

TP Mechanical’s design/build capabilities deliver a unique value to our customers. We pair decades of knowledge and experience with the latest technology.

Utilizing an integrated design-build delivery team, this partnership met a challenging schedule on four dormitory projects at the University of Kentucky. The projects included development of new dormitories, plus new residence halls on the north end of campus (Cooperstown).

TP Mechanical designed each building by utilizing Building Information Modeling (BIM) technology. TP Mechanical’s team then created the detailed installation drawings. The plumbing design for the projects included domestic hot and cold water, natural gas systems and sanitary waste ventilation.

The scope of these projects required contributions from nearly every team at TP Mechanical; from contracting and prefabrication to CAD. With extensive teamwork and collaboration from every department, the team utilized the latest technology, along with some creative problem solving, to conquer the many challenges presented by these buildings.

The first step was to prefabricate the piping and get it to the job site in a timely manner. The elevated decks were cast concrete (and post-tensioned at the Champions Court 1 location), so there was no room for error when it came to locating the sleeves without coring. The combined team utilized the CAD system and an in-the-field Trimble unit to eliminate mistakes made by human error.

By using this approach, it allowed TP Mechanical to complete the job rapidly by facilitating faster location and layout of sleeves, underground piping and mechanical chases.

By integrating innovative technological advances such as CAD and Trimble, our team took teamwork to the next level. We were able to complete the projects in time to open the doors of four new dormitory buildings to UK students.  

 

TP Mechanical’s design/build capabilities deliver a uni
que value to our customers. We pair decades of knowle
dge and
experience with the latest technology.
Utilizing an integrated design-build delivery team,
this partnership met a challenging schedule on four d
ormitory projects at
the University of Kentucky. The projects included deve
lopment of new dormitories, plus new residence halls
on the north
end of campus (Cooperstown).
TP Mechanical designed each building by utilizing Buil
ding Information Modeling (BIM) technology. TP Mecha
nical’s team
then created the detailed installation drawings. The
plumbing design for the projects included domestic ho
t and cold water,
natural gas systems and sanitary waste ventilation.
The scope of these projects required contributions fro
m nearly every team at TP Mechanical; from contracting a
nd
prefabrication to CAD. With extensive teamwork and coll
aboration from every department, the team utilized t
he latest
technology, along with some creative problem solving,
to conquer the many challenges presented by these b
uildings.
The first step was to prefabricate the piping and ge
t it to the job site in a timely manner. The elevat
ed decks were cast
concrete (and post-tensioned at the Champions Court 1
location), so there was no room for error when it cam
e to locating
the sleeves without coring. The combined team utilized
the CAD system and an in-the-field Trimble unit to
eliminate
mistakes made by human error.
By using this approach, it allowed TP Mechanical to comp
lete the job rapidly by facilitating faster location
and layout of
sleeves, underground piping and mechanical chases.
By integrating innovative technological advances such
as CAD and Trimble, our team took teamwork to the nex
t level. We
were able to complete the projects in time to open th
e doors of four new dormitory buildings to UK stude
nts.
TP Mechanical’s design/build capabilities deliver a uni
que value to our customers. We pair decades of knowle
dge and
experience with the latest technology.
Utilizing an integrated design-build delivery team,
this partnership met a challenging schedule on four d
ormitory projects at
the University of Kentucky. The projects included deve
lopment of new dormitories, plus new residence halls
on the north
end of campus (Cooperstown).
TP Mechanical designed each building by utilizing Buil
ding Information Modeling (BIM) technology. TP Mecha
nical’s team
then created the detailed installation drawings. The
plumbing design for the projects included domestic ho
t and cold water,
natural gas systems and sanitary waste ventilation.
The scope of these projects required contributions fro
m nearly every team at TP Mechanical; from contracting a
nd
prefabrication to CAD. With extensive teamwork and coll
aboration from every department, the team utilized t
he latest
technology, along with some creative problem solving,
to conquer the many challenges presented by these b
uildings.
The first step was to prefabricate the piping and ge
t it to the job site in a timely manner. The elevat
ed decks were cast
concrete (and post-tensioned at the Champions Court 1
location), so there was no room for error when it cam
e to locating
the sleeves without coring. The combined team utilized
the CAD system and an in-the-field Trimble unit to
eliminate
mistakes made by human error.
By using this approach, it allowed TP Mechanical to comp
lete the job rapidly by facilitating faster location
and layout of
sleeves, underground piping and mechanical chases.
By integrating innovative technological advances such
as CAD and Trimble, our team took teamwork to the nex
t level. We
were able to complete the projects in time to open th
e doors of four new dormitory buildings to UK stude
nts.

Industries