888-534-4928

Healthcare

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

The Christ Hospital

Messer Construction

SOM Ohio LLC

Fosdick and Hilmer

Hospital

$4.8 million

May 2013

TBD

The Christ Hospital in Cincinnati, Ohio, began construction of a $265-million expansion in June 2012. The new Orthopedic and Spine Center will enable Christ to be the only local hospital, and one of a few in the country, to have a single-purpose facility with a focus on comprehensive orthopaedic and spine services and research.

Once completed, the new 332,000-square-foot facility, which will be located just south of the main hospital, will physically connect to the current hospital while providing separate access for patients and visitors. The orthopaedic ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Mayflower Communities

LECESSE Construction

AG Architecture

AG Architecture

Hospital/Assisted Living

$2.7 million

August 2012

January 2014

The Barrington of Carmel is a Senior Living Community that offers luxurious living accommodations in Carmel, Indiana. Barrington has five sister communities located in Texas; making this community one of kind in the Midwest. Barrington offers on-site healthcare including assisted living, skilled nursing and memory support. 

TP Mechanical was hired to install the plumbing for this project. The weather conditions provided a challenge as they were not always favorable. In order to keep the piping and fittings clean, an ISO certified fabrication facility was utilized to assemble ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Adena Health

Danis Building Construction Co.

Design Group

Korda/Nemeth Engineering, Inc

Hospital

$7.1 million

August 2008

April 2010

The Adena Northeast Expansion project at 272 Hospital Road, Chillicothe, OH, was completed in April 2010; TP Mechanical installed the plumbing, HVAC and fire protection systems and provided coordination services.

The project’s original contract value was $7,010,142, and had a final contract value of $7,168,000, due to owner additions and changes. The project was originally scheduled to be completed by January 2010; the actual completion date was April 2010.

The TP Mechanical team brought several innovative approaches to the project. Floor penetration layouts were performed using a Trimble Robotic ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Mount Carmel Health Systems

Messer Construction Company

Moody Nolan Architects

Heapy Engineering

Hospital

$2.6 million

May 2010

January 2011

The New Albany Surgical Hospital project at 7333 Smith’s Mill Road, New Albany, Ohio, was completed in January 2011.  TP Mechanical installed and remodeled the HVAC, plumbing and fire protection systems.

The Mt. Carmel New Albany Hospital has a long-standing tradition of excellence. For seven years running, they have received the Summit Award from the national healthcare research firm, Press Ganey Associates, for “sustained excellence in patient care.” Building surgery and nursing additions furthered their value proposition as a leader in the healthcare field in ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Methodist Eldercare Services

Messer Construction Company

pH7 Architects, Inc.

X-Cel Engineering

Healthcare

$1.9 million

February 2011

May 2012

The Wesley Glenn Wellness & Therapy addition began in the early spring of 2011, taking more than 14,000 man hours to complete by May of 2012. The Wesley Glen project was a building addition to an existing wellness center in a retirement village associated with Methodist Eldercare. The retirement facility had been using a bus to transport its residents across town to their sister facility for wellness and therapy and decided to add the center to their Clintonville location. 

The building’s design included a well-equipped workout ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Premier Health Partners

Skanska Shook, JV

NBBJ

Korda/Nemeth Engineering

Hospital

$31.3 million

September 2008

December 2010

The Miami Valley Heart Tower project located at One Wyoming Street, Dayton, OH started in September 2008 was completed in December 2010 with a total construction value of $31.3 million. TP Mechanical was the plumbing and mechanical contractor for the project with a design-assist contract. The 12-story tower addition to the main campus of Miami Valley Hospital was constructed with 6 floors of cast-in-place concrete topped with structural steel and clad with a combination of precast and curtain-wall. The focus of the new tower is a comprehensive heart ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Mount Carmel Health System

Messer Construction Co.

Moody Nolan Inc.

Heapy Engineering

Hospital, Healthcare

$1.6 million

November 2012

December 2013

Mount Carmel Health Systems required quick occupancy, and a normal construction schedule would not meet their needs.  TP Mechanical proposed a prefabrication process to reduce the construction schedule.  We rented a warehouse two miles from the project to prefabricate 1,500 feet of rack systems that included domestic water, fire protection, medical gas, heating hot water, supply and return ductwork, VAV terminal units, control wiring, and electrical services.  The piping and ductwork were pressure-tested prior to delivery.The Mount Carmel St Ann’s Tower project located at 500 ...Read More

 

UK’s College of Pharmacy is ranked 5th in the nation and its 286,000-square-foot BioPharm complex facility was created to provide top researchers, scientific minds and students with 21st-century tools. The research conducted in this building has an impact on the future of medicine and changes lives.

The first three floors of the building were completed in January 2010 and opened to pharmacy students and faculty. Although the fourth and fifth floors were slated to house research labs, they had not yet been fitted out. TP Mechanical took on the challenge of completing the mechanical service for these two additional floors.

The project ...Read More

Kindred Hospital Dayton is a long-term acute care hospital specializing in the treatment and rehabilitation of patients with medically complex conditions that require extra medical attention and extended hospital stays. Patients at Kindred Hospital depend upon ventilators, IV therapy, dialysis or extensive clinical care due to medically complex conditions. Many of the hospitals’ patients have serious pulmonary or cardiac disease, pressure wounds or post-operative complications. A facility offering this kind of care requires precise and intricate mechanical systems.

When it came time to relocate the facility to the building that formerly housed the Dayton Heart Hospital, substantial renovations were required. TP ...Read More

The Norton Healthcare downtown campus in Louisville, Ky., was expanding to include the Norton Cancer Institute Radiation Center, a dedicated facility for the treatment of pediatric and adult cancers with the latest advances in technology. TP Mechanical was awarded the HVAC and Plumbing contracts, which included routing piping from existing mechanical rooms in other Norton medical buildings.

The main campus is about 1.1 acres away from the existing buildings, and the mechanical project included routing from a storage closet in the middle of the hospital’s OR department to the new facility through a tunnel under the street. The steam and chilled ...Read More

Owner:

Construction Manager:

Architect:

Engineer:

Industry:

Contract:

Start Date:

End Date:

Premier Health Partners

Skanska Shook, JV

Gresham Smith and Partners

Gresham Smith and Partners

Healthcare

$16.2 million

February 2011

September 2012

The Miami Valley Hospital South Bed Tower project at 5801 Clyo Road, Centerville, OH was completed in September 2012 with a total construction value of $16.2 million. Miami Valley Hospital South (MVHS) added a five-story addition with 64 private patient rooms dedicated to orthopedics, obstetrical and medical surgical care as part of its long-range facility plan. TP Mechanical installed the HVAC piping, sheet metal, medical gas piping and plumbing under a design assist contract.

The aggressive project schedule created challenges for the construction team.  TP ...Read More

Skip to toolbar